Parkside Pond Outlet Repairs

Active Project Status


Updated:

July 2016

Project Name:

Parkside Pond Outlet Repairs

Project Description:

The outlet pipe for the upper pond at Westlands Park (Parkside Pond) failed in 2015. Temporary repairs to pass storm events were also completed in 2015. Design of a modified outlet structure and new storm sewer is required to assure proper long term functionality of the system.

Project Manager:

Justin Williams

Project Status:

Staff has been collaborating with the consultant regarding the design of the structure and modifications to the pond, including future use as stormwater detention and metering for potential irrigation supply. It is anticipated that the project will be bid September/October 2016.