Long Road Reconstruction Design
Greenwood Village Public Works
Active Project Status

Updated: March 2017

Project Name: Long Road Reconstruction

Project Description: The project will optimize the effectiveness of traffic calming and utilize other mitigation techniques to minimize the negative impacts of current and future traffic volumes. The project will consists of pavement reconstruction, upgrading of the drainage system and enhancement of the streetscape section.

Project Manager: John Wannigman

Project Status:  Long Road was rebid in January and was combined with the Holly Street Intersection Rehabilitation project to further encourage better pricing and participation. The successful contractor is Duran Excavating Inc.  The Long Road project is scheduled to begin in April and will require the closure of the road through December 2017. 