Backyard chickens or honey bees are allowed. They must be kept in a healthy and humane manner.
Show All Answers
A valid solicitation permit is required and the solicitor must keep the permit with them at all times. They shall not solicit at any property where a “No Solicitors” or “No Trespassing” sign is posted at or near the entrance. Soliciting may not occur outside of the hours of 7:00 a.m. to 7:00 p.m. or sunset, even with a valid permit.
Short-term rental of non-principal residences is prohibited. It shall be unlawful to offer property as a short-term rental that is not the primary dwelling unit or habitable accessory structure of the property’s owner or leaseholder. Occupancy of a short-term rental shall not exceed the total of three unrelated persons.
Although not all improvements require a permit, items such as decks, fences, plumbing, landscaping, electrical, and other projects do. Email Community Development or call (303) 486-5783 to ensure a permit is not required before starting any work.
Trash and recycling containers must be stored in such a position on the property to be reasonably screened from the view of those off the property.
Yes, these are intended to reduce the impact of the construction site on adjacent properties. Facilities shall not be located in the public right-of-way or closer than five feet from a side or rear property line. Sanitary facilities are to be screened and/or located in the least visible location to adjacent properties.
Materials are not to be stored on the public right-of-way. Furthermore, when possible, on-site parking for employees is encouraged. Parking on public and private streets is allowed when adequate on-site parking is not available. Construction is not to obstruct vehicle access for firefighting and other emergency vehicles.
Fencing is required for below-grade construction in excess of 30 inches that is unattended at any time or open overnight. Construction fencing will be allowed as part of the building permit.
Monday - Friday: 7:00 a.m. to 7:00 p.m.
Saturday: 8:00 a.m. to 7:00 p.m.
Sunday / Holidays: 10:00 a.m. to 7:00 p.m.
Buildings or those portions of a building constructed before October 12, 1988, require an asbestos report. Asbestos permits and requirements are monitored and set by the State of Colorado. Additional details may be found by visiting the Colorado Department of Public Health and Environment's website.